Projects
Project Clay
Clay was a new build project, with the full electrical design completed by Coljoint. The new build consisted of 185 lighting circuits, fed from 7 lighting control panels
Rosarium Bar and Restaurant
The Rosarium is a new bar & restaurant located within The Sidings at Waterloo Station, London. Three different themes pass through the bar and restaurant which are k
Network Rail – LCS Units (NSCD)
The Negative Short Circuit Device (NSCD) provides a short-circuit path between the DC Traction Supply and the Negative Return to protect against the inadvertent re-energ
Project Croft
Maycroft is a large domestic house refurbishment, double side & single rear extension, along with a coach house at the bottom of the garden in Kent. The house was st
Waterloo LV Switch Room
We were given the task to complete the electrical installation for 2 new panel boards to supply the essential & non-essential distribution boards for the show area,
Network Rail – Modular HSS Switchgear (NSCD)
The Negative Short Circuit Device (NSCD) provides a short-circuit path between the DC Traction Supply and the Negative Return to protect against the inadvertent re-energ
Project Platt
Project Platt was a Full refurbishment and redesign of an existing dwelling, the only existing feature which remained was the external walls, the redesigned house consis
Finch Wine Bar
Finch Project is a small wine bar located in Brixton Village. Coljoint was contracted to complete the full electrical fit-out of a new submain supply to cope with the de
Network Rail – HSS Switchgear (NSCD)
The Negative Short Circuit Device (NSCD) provides a short-circuit path between the DC Traction Supply and the Negative Return to protect against the inadvertent re-energ
Kings Building
Project Kings Building is a commercial office block located in the heart of Westminster. Coljoint assisted our client Dollman Ralston, with the refurbishment of the main
Trimley Station
Project Trimley Station was the upgrade of lighting to the station platform, car park, and pedestrian footbridge. We (Coljoint) worked closely with our client, the KN Gr
Biscuit Factory
Biscuit Factory project consists of an internal refurbishment. our contract was to completely overhaul and refurbish the communal areas across all four floors within Blo
Network Rail Points Heating
The railway infrastructure is acceptable to harsh weather conditions, for these reasons track points are heated in the winter months, this stops the points from freezing
Tooting Works
Project Tooting- consisted of the refurbishment of four existing office units, a new industrial kitchen, communal kitchen, and a seating area. We assisted our client Dol
Network Rail – SIM119
Project SIM-119 was the removal of the existing 650v connections located within track signalling cabinets. The existing connections had exposed terminals which were unsa
Archer Street
Project Archer Street was a refurbishment of four existing office units. Our client workspace requested all services to be exposed surface mounted, to compliment the ori
Bond Street
Bond Street station upgrade was the modernisation and expansion, to allowed for an extra 30% capacity in preparation for the new, Elizabeth Line. A full refurbishment wa